background image

AIM

8/15/19

5

4

46

Arrival Procedures

FIG 5

4

24

PRM Attention All Users Page (AAUP)

 

g. Simultaneous Offset Instrument Approach

(SOIA).

1.

SOIA is a procedure used to conduct

simultaneous approaches to runways spaced less than
3,000 feet, but at least 750 feet apart. The SOIA
procedure utilizes a straight

in PRM approach to one

runway, and a PRM offset approach with glides-

lope/glidepath to the adjacent runway. In SOIA
operations, aircraft are paired, with the aircraft
conducting the straight

in PRM approach always

positioned slightly ahead of the aircraft conducting
the offset PRM approach.

2.

The straight

in PRM approach plates used in

SOIA operations are identical to other straight

in