background image

Pilot/Controller Glossary

8/15/19

PCG E

2

EN ROUTE TRANSITION

a.

Conventional STARs/SIDs. The portion of a

SID/STAR that connects to one or more en route
airway/jet route.

b.

RNAV STARs/SIDs. The portion of a STAR

preceding the common route or point, or for a SID the
portion following, that is coded for a specific en route
fix, airway or jet route.

ESP

(See EN ROUTE SPACING PROGRAM.)

EST

(See ESTIMATED.)

ESTABLISHED

 To be stable or fixed at an altitude

or on a course, route, route segment, heading,
instrument approach or departure procedure, etc.

ESTABLISHED ON RNP (EoR) CONCEPT– A
system of authorized instrument approaches, ATC
procedures, surveillance, and communication re-
quirements that allow aircraft operations to be safely
conducted with approved reduced separation criteria
once aircraft are established on a PBN segment of a
published instrument flight procedure.

ESTIMATED (EST)

When used in NOTAMs

“EST” is a contraction that is used by the issuing
authority only when the condition is expected to
return to service prior to the expiration time. Using
“EST” lets the user know that this NOTAM has the
possibility of returning to service earlier than the
expiration time. Any NOTAM which includes an
“EST” will be auto

expired at the designated

expiration time.

ESTIMATED ELAPSED TIME [ICAO]

 The

estimated time required to proceed from one
significant point to another.

(See ICAO Term TOTAL ESTIMATED ELAPSED

TIME.)

ESTIMATED OFF-BLOCK TIME [ICAO]

 The

estimated time at which the aircraft will commence
movement associated with departure.

ESTIMATED POSITION ERROR (EPE)

(See Required Navigation Performance)

ESTIMATED TIME OF ARRIVAL

 The time the

flight is estimated to arrive at the gate (scheduled
operators) or the actual runway on times for
nonscheduled operators.

ESTIMATED TIME EN ROUTE

 The estimated

flying time from departure point to destination
(lift-off to touchdown).

ETA

(See ESTIMATED TIME OF ARRIVAL.)

ETE

(See ESTIMATED TIME EN ROUTE.)

EXECUTE MISSED APPROACH

 

Instructions

issued to a pilot making an instrument approach
which means continue inbound to the missed
approach point and execute the missed approach
procedure as described on the Instrument Approach
Procedure Chart or as previously assigned by ATC.
The pilot may climb immediately to the altitude
specified in the missed approach procedure upon
making a missed approach. No turns should be
initiated prior to reaching the missed approach point.
When conducting an ASR or PAR approach, execute
the assigned missed approach procedure immediately
upon receiving instructions to “execute missed
approach.”

(Refer to AIM.)

EXPECT (ALTITUDE) AT (TIME) or (FIX)

 

Used

under certain conditions to provide a pilot with an
altitude to be used in the event of two-way
communications failure. It also provides altitude
information to assist the pilot in planning.

(Refer to AIM.)

EXPECT DEPARTURE CLEARANCE TIME
(EDCT)

 The runway release time assigned to an

aircraft in a traffic management program and shown
on the flight progress strip as an EDCT.

(See GROUND DELAY PROGRAM.)

EXPECT FURTHER CLEARANCE (TIME)

 

The

time a pilot can expect to receive clearance beyond a
clearance limit.

EXPECT FURTHER CLEARANCE VIA (AIR-
WAYS, ROUTES OR FIXES)

 

Used to inform a

pilot of the routing he/she can expect if any part of the
route beyond a short range clearance limit differs
from that filed.

EXPEDITE

 

Used by ATC when prompt com-

pliance is required to avoid the development of an
imminent situation. Expedite climb/descent normal-
ly indicates to a pilot that the approximate best rate
of climb/descent should be used without requiring an
exceptional change in aircraft handling characteris-
tics.