background image

409 

Federal Aviation Administration, DOT 

Pt. 25, App. F 

and a .020 inch (5.1 mm) thick wide area 
washer must be held between two 

1

2

-inch (13 

mm) nuts that are adjusted to tightly cover 
the hole in the radiation doors through 
which the injection rod or calibration calo-
rimeter pass. 

(7) 

Calorimeter. 

A total-flux type calo-

rimeter must be mounted in the center of a 

1

2

-inch Kaowool ‘‘M’’ board inserted in the 

sample holder to measure the total heat flux. 
The calorimeter must have a view angle of 
180 degrees and be calibrated for incident 
flux. The calorimeter calibration must be ac-
ceptable to the Administrator. 

(8) 

Pilot-Flame Positions. 

Pilot ignition of 

the specimen must be accomplished by si-
multaneously exposing the specimen to a 
lower pilot burner and an upper pilot burner, 
as described in paragraph (b)(8)(i) and 
(b)(8)(ii) or (b)(8)(iii) of this part IV, respec-
tively. Since intermittent pilot flame extin-
guishment for more than 3 seconds would in-
validate the test results, a spark ignitor may 
be installed to ensure that the lower pilot 
burner remains lighted. 

(i) 

Lower Pilot Burner. 

The pilot-flame tub-

ing must be .25 inch (6.3 mm) O.D., .03 inch 
(0.8mm) wall, stainless steel tubing. A mix-
ture of 120 cm

3

/min. of methane and 850 cm

3

min. of air must be fed to the lower pilot 
flame burner. The normal position of the end 
of the pilot burner tubing is .40 inch (10 mm) 
from and perpendicular to the exposed 
vertical surface of the specimen. The center-
line at the outlet of the burner tubing must 
intersect the vertical centerline of the sam-
ple at a point .20 inch (5 mm) above the lower 
exposed edge of the specimen. 

(ii) 

Standard Three-Hole Upper Pilot Burner. 

The pilot burner must be a straight length of 
.25 inch (6.3 mm) O.D., .03 inch (0.8 mm) wall, 
stainless steel tubing that is 14 inches (360 
mm) long. One end of the tubing must be 
closed, and three No. 40 drill holes must be 
drilled into the tubing, 2.38 inch (60 mm) 
apart, for gas ports, all radiating in the same 
direction. The first hole must be .19 inch (5 
mm) from the closed end of the tubing. The 
tube must be positioned .75 inch (19 mm) 
above and .75 inch (19 mm) behind the ex-
posed upper edge of the specimen. The mid-
dle hole must be in the vertical plane perpen-
dicular to the exposed surface of the speci-
men which passes through its vertical cen-
terline and must be pointed toward the radi-
ation source. The gas supplied to the burner 
must be methane and must be adjusted to 
produce flame lengths of 1 inch (25 mm). 

(iii) 

Optional Fourteen-Hole Upper Pilot 

Burner. 

This burner may be used in lieu of 

the standard three-hole burner described in 
paragraph (b)(8)(ii) of this part IV. The pilot 
burner must be a straight length of .25 inch 
(6.3 mm) O.D., .03 inch (0.8 mm) wall, stain-
less steel tubing that is 15.75 inches (400 mm) 
long. One end of the tubing must be closed, 
and 14 No. 59 drill holes must be drilled into 

the tubing, .50 inch (13 mm) apart, for gas 
ports, all radiating in the same direction. 
The first hole must be .50 inch (13 mm) from 
the closed end of the tubing. The tube must 
be positioned above the specimen holder so 
that the holes are placed above the specimen 
as shown in Figure 1B of this part IV. The 
fuel supplied to the burner must be methane 
mixed with air in a ratio of approximately 
50/50 by volume. The total gas flow must be 
adjusted to produce flame lengths of 1 inch 
(25 mm). When the gas/air ratio and the flow 
rate are properly adjusted, approximately .25 
inch (6 mm) of the flame length appears yel-
low in color. 

(c) 

Calibration of Equipment

—(1) 

Heat Re-

lease Rate. 

A calibration burner, as shown in 

Figure 4, must be placed over the end of the 
lower pilot flame tubing using a gas tight 
connection. The flow of gas to the pilot 
flame must be at least 99 percent methane 
and must be accurately metered. Prior to 
usage, the wet test meter must be properly 
leveled and filled with distilled water to the 
tip of the internal pointer while no gas is 
flowing. Ambient temperature and pressure 
of the water are based on the internal wet 
test meter temperature. A baseline flow rate 
of approximately 1 liter/min. must be set and 
increased to higher preset flows of 4, 6, 8, 6 
and 4 liters/min. Immediately prior to re-
cording methane flow rates, a flow rate of 8 
liters/min. must be used for 2 minutes to pre-
condition the chamber. This is not recorded 
as part of calibration. The rate must be de-
termined by using a stopwatch to time a 
complete revolution of the wet test meter for 
both the baseline and higher flow, with the 
flow returned to baseline before changing to 
the next higher flow. The thermopile base-
line voltage must be measured. The gas flow 
to the burner must be increased to the high-
er preset flow and allowed to burn for 2.0 
minutes, and the thermopile voltage must be 
measured. The sequence must be repeated 
until all five values have been determined. 
The average of the five values must be used 
as the calibration factor. The procedure 
must be repeated if the percent relative 
standard deviation is greater than 5 percent. 
Calculations are shown in paragraph (f) of 
this part IV. 

(2) 

Flux Uniformity. 

Uniformity of flux over 

the specimen must be checked periodically 
and after each heating element change to de-
termine if it is within acceptable limits of 
plus or minus 5 percent. 

(3) As noted in paragraph (b)(2) of this part 

IV, thermopile hot junctions must be cleared 
of soot deposits as needed to maintain the 
calibrated sensitivity. 

(d) 

Preparation of Test Specimens. 

(1) The 

test specimens must be representative of the 
aircraft component in regard to materials 
and construction methods. The standard size 
for the test specimens is 5.91 

±

.03 

× 

5.91 

±

.03 

inches (149 

±

× 

149 

±

1 mm). The thickness of 

VerDate Sep<11>2014 

12:50 Apr 30, 2019

Jkt 247046

PO 00000

Frm 00419

Fmt 8010

Sfmt 8002

Y:\SGML\247046.XXX

247046

spaschal on DSK3GDR082PROD with CFR