14 CFR Ch. I (1-1-19 Edition) (Note: For blanket materials that cannot be installed in accordance with figure 7 above, the blankets must be installed in a manner approved by the FAA.) (v) Conditioning. Condition the specimens at 70Section Section5 SectionF (21Section Section2 SectionC) and 55% Section10% relative humidity for a minimum of 24 hours prior to testing. (d) Preparation of apparatus. (1) Level and center the frame assembly to ensure alignment of the calorimeter and/or thermocouple rake with the burner cone. (2) Turn on the ventilation hood for the test chamber. Do not turn on the burner blower. Measure the airflow of the test chamber using a vane anemometer or equivalent measuring device. The vertical air velocity just behind the top of the upper insulation blanket test specimen must be 100 Section50 ft/min (0.51 Section0.25 m/s). The horizontal air velocity at this point must be less than 50 ft/ min (0.25 m/s). (3) If a calibrated flow meter is not available, measure the fuel flow rate using a graduated cylinder of appropriate size. Turn on the burner motor/fuel pump, after insuring that the igniter system is turned off. Collect the fuel via a plastic or rubber tube into the 440 VerDate Sep<11>2014 12:50 Apr 30, 2019 Jkt 247046 PO 00000 Frm 00450 Fmt 8010 Sfmt 8002 Y:\SGML\247046.XXX 247046 ER31JY03.018 spaschal on DSK3GDR082PROD with CFR Pt. 25, App. F