473
Federal Aviation Administration, DOT
§ 26.21
structural maintenance program (here-
after referred to as LOV) that cor-
responds to the period of time, stated
as a number of total accumulated
flight cycles or flight hours or both,
during which it is demonstrated that
widespread fatigue damage will not
occur in the airplane. This demonstra-
tion must include an evaluation of air-
plane structural configurations and be
supported by test evidence and analysis
at a minimum and, if available, service
experience, or service experience and
teardown inspection results, of high-
time airplanes of similar structural de-
sign, accounting for differences in op-
erating conditions and procedures. The
airplane structural configurations to
be evaluated include—
(i) All model variations and deriva-
tives approved under the type certifi-
cate; and
(ii) All structural modifications to
and replacements for the airplane
structural configurations specified in
paragraph (b)(1)(i) of this section, man-
dated by airworthiness directives as of
January 14, 2011.
(2) If the LOV depends on perform-
ance of maintenance actions for which
service information has not been man-
dated by airworthiness directive as of
January 14, 2011, submit the following
to the responsible Aircraft Certifi-
cation Service office:
(i) For those maintenance actions for
which service information has been
issued as of the applicable compliance
date specified in paragraph (c) of this
section, a list identifying each of those
actions.
(ii) For those maintenance actions
for which service information has not
been issued as of the applicable compli-
ance date specified in paragraph (c) of
this section, a list identifying each of
those actions and a binding schedule
for providing in a timely manner the
necessary service information for those
actions. Once the responsible Aircraft
Certification Service office approves
this schedule, each person identified in
paragraph (c) of this section must com-
ply with that schedule.
(3) Unless previously accomplished,
establish an Airworthiness Limitations
section (ALS) for each airplane struc-
tural configuration evaluated under
paragraph (b)(1) of this section.
(4) Incorporate the applicable LOV
established under paragraph (b)(1) of
this section into the ALS for each air-
plane structural configuration evalu-
ated under paragraph (b)(1) and submit
it to the responsible Aircraft Certifi-
cation Service office for approval.
(c)
Persons who must comply and com-
pliance dates.
The following persons
must comply with the requirements of
paragraph (b) of this section by the
specified date.
(1) Holders of type certificates (TC)
of airplane models identified in Table 1
of this section: No later than the appli-
cable date identified in Table 1 of this
section.
(2) Applicants for TCs, if the date of
application was before January 14, 2011:
No later than the latest of the fol-
lowing dates:
(i) January 14, 2016;
(ii) The date the certificate is issued;
or
(iii) The date specified in the plan ap-
proved under § 25.571(b) for completion
of the full-scale fatigue testing and
demonstrating that widespread fatigue
damage will not occur in the airplane
structure.
(3) Applicants for amendments to
TCs, with the exception of amendments
to TCs specified in paragraphs (c)(6) or
(c)(7) of this section, if the original TC
was issued before January 14, 2011: No
later than the latest of the following
dates:
(i) January 14, 2016;
(ii) The date the amended certificate
is issued; or
(iii) The date specified in the plan ap-
proved under § 25.571(b) for completion
of the full-scale fatigue testing and
demonstrating that widespread fatigue
damage will not occur in the airplane
structure.
(4) Applicants for amendments to
TCs, with the exception of amendments
to TCs specified in paragraphs (c)(6) or
(c)(7) of this section, if the application
for the original TC was made before
January 14, 2011 but the TC was not
issued before January 14, 2011: No later
than the latest of the following dates:
(i) January 14, 2016;
(ii) The date the amended certificate
is issued; or
(iii) The date specified in the plan ap-
proved under § 25.571(b) for completion
VerDate Sep<11>2014
12:50 Apr 30, 2019
Jkt 247046
PO 00000
Frm 00483
Fmt 8010
Sfmt 8010
Y:\SGML\247046.XXX
247046
spaschal on DSK3GDR082PROD with CFR