485
Federal Aviation Administration, DOT
Pt. 27
(3) For alteration data developed
after January 11, 2008, the DT data re-
quired by paragraph (c)(2) of this sec-
tion must be submitted before approval
of the alteration data and making it
available to persons required to comply
with §§ 121.1109 and 129.109 of this chap-
ter.
(4) For repair data developed and ap-
proved before January 11, 2008, the DT
data required by paragraph (d)(2) of
this section must be submitted by June
30, 2009.
(5) For repair data developed and ap-
proved after January 11, 2008, the DT
data required by paragraph (d)(2) of
this section, must be submitted within
12 months after initial approval of the
repair data and before making the DT
data available to persons required to
comply with §§ 121.1109 and 129.109 of
this chapter.
[Docket No. FAA–2005–21693, 72 FR 70505, Dec.
12, 2007, as amended by Doc. No. FAA–2018–
0119, Amdt. 26–7, 83 FR 9170, Mar. 5, 2018]
§ 26.49
Compliance plan.
(a)
Compliance plan.
Except for appli-
cants for type certificates and supple-
mental type certificates whose applica-
tions are submitted after January 11,
2008, each person identified in §§ 26.43,
26.45, and 26.47, must submit a compli-
ance plan consisting of the following:
(1) A project schedule identifying all
major milestones for meeting the com-
pliance times specified in §§ 26.43(f),
26.45(e), and 26.47(e), as applicable.
(2) A proposed means of compliance
with §§ 26.43, 26.45, and 26.47, as applica-
ble.
(3) A plan for submitting a draft of
all compliance items required by this
subpart for review by the responsible
Aircraft Certification Service office
not less than 60 days before the appli-
cable compliance date.
(b)
Compliance dates for compliance
plans.
The following persons must sub-
mit the compliance plan described in
paragraph (a) of this section to the re-
sponsible Aircraft Certification Service
office for approval on the following
schedule:
(1) For holders of type certificates,
no later than 90 days after January 11,
2008.
(2) For holders of supplemental type
certificates no later than 180 days after
January 11, 2008.
(3) For applicants for changes to type
certificates whose application are sub-
mitted before January 11, 2008, no later
than 180 days after January 11, 2008.
(c)
Compliance Plan Implementation.
Each affected person must implement
the compliance plan as approved in
compliance with paragraph (a) of this
section.
[Docket No. FAA–2005–21693, 72 FR 70505, Dec.
12, 2007, as amended by Doc. No. FAA–2018–
0119, Amdt. 26–7, 83 FR 9170, Mar. 5, 2018]
PART 27—AIRWORTHINESS STAND-
ARDS: NORMAL CATEGORY
ROTORCRAFT
Subpart A—General
Sec.
27.1
Applicability.
27.2
Special retroactive requirements.
Subpart B—Flight
G
ENERAL
27.21
Proof of compliance.
27.25
Weight limits.
27.27
Center of gravity limits.
27.29
Empty weight and corresponding cen-
ter of gravity.
27.31
Removable ballast.
27.33
Main rotor speed and pitch limits.
P
ERFORMANCE
27.45
General.
27.49
Performance at minimum operating
speed.
27.51
Takeoff.
27.65
Climb: all engines operating.
27.67
Climb: one engine inoperative.
27.71
Autorotation performance.
27.75
Landing.
27.87
Height-speed envelope.
F
LIGHT
C
HARACTERISTICS
27.141
General.
27.143
Controllability and maneuverability.
27.151
Flight controls.
27.161
Trim control.
27.171
Stability: general.
27.173
Static longitudinal stability.
27.175
Demonstration of static longitudinal
stability.
27.177
Static directional stability.
G
ROUND AND
W
ATER
H
ANDLING
C
HARACTERISTICS
27.231
General.
27.235
Taxiing condition.
VerDate Sep<11>2014
12:50 Apr 30, 2019
Jkt 247046
PO 00000
Frm 00495
Fmt 8010
Sfmt 8010
Y:\SGML\247046.XXX
247046
spaschal on DSK3GDR082PROD with CFR