729
Federal Aviation Administration, DOT
§ 33.87
burning thrust augmentor augmenta-
tion position if additional time to con-
firm ignition is necessary.
(ii) During the runs at any rated aug-
mented thrust the hydraulic fluid tem-
perature must be maintained at the
limiting temperature except where the
test periods are not long enough to
allow stabilization.
(iii) During the simulated supersonic
runs the fuel temperature and induc-
tion air temperature may not be less
than the limiting temperature.
(iv) The endurance test must be con-
ducted with the fuel burning thrust
augmentor installed, with the primary
and secondary exhaust nozzles in-
stalled, and with the variable area ex-
haust nozzles operated during each run
according to the methods specified in
complying with § 33.5(b).
(v) During the runs at thrust settings
for maximum continuous thrust and
percentages thereof, the engine must
be operated with the inlet air distor-
tion at the limit for those thrust set-
tings.
(b)
Engines other than certain rotor-
craft engines.
For each engine except a
rotorcraft engine for which a rating is
desired under paragraph (c), (d), or (e)
of this section, the applicant must con-
duct the following runs:
(1)
Takeoff and idling.
One hour of al-
ternate five-minute periods at rated
takeoff power or thrust and at idling
power or thrust. The developed powers
or thrusts at takeoff and idling condi-
tions and their corresponding rotor
speed and gas temperature conditions
must be as established by the power
control in accordance with the sched-
ule established by the applicant. The
applicant may, during any one period,
manually control the rotor speed,
power, or thrust while taking data to
check performance. For engines with
augmented takeoff power ratings that
involve increases in turbine inlet tem-
perature, rotor speed, or shaft power,
this period of running at takeoff must
be at the augmented rating. For en-
gines with augmented takeoff power
ratings that do not materially increase
operating severity, the amount of run-
ning conducted at the augmented rat-
ing is determined by the FAA. In
changing the power setting after each
period, the power-control lever must be
moved in the manner prescribed in
paragraph (b)(5) of this section.
(2)
Rated maximum continuous and
takeoff power or thrust.
Thirty minutes
at—
(i) Rated maximum continuous power
or thrust during fifteen of the twenty-
five 6-hour endurance test cycles; and
(ii) Rated takeoff power or thrust
during ten of the twenty-five 6-hour en-
durance test cycles.
(3)
Rated maximum continuous power or
thrust.
One hour and 30 minutes at
rated maximum continuous power or
thrust.
(4)
Incremental cruise power or thrust.
Two hours and 30 minutes at the suc-
cessive power lever positions cor-
responding to at least 15 approximately
equal speed and time increments be-
tween maximum continuous engine ro-
tational speed and ground or minimum
idle rotational speed. For engines oper-
ating at constant speed, the thrust and
power may be varied in place of speed.
If there is significant peak vibration
anywhere between ground idle and
maximum continuous conditions, the
number of increments chosen may be
changed to increase the amount of run-
ning made while subject to the peak vi-
brations up to not more than 50 percent
of the total time spent in incremental
running.
(5)
Acceleration and deceleration runs.
30 minutes of accelerations and decel-
erations, consisting of six cycles from
idling power or thrust to rated takeoff
power or thrust and maintained at the
takeoff power lever position for 30 sec-
onds and at the idling power lever posi-
tion for approximately four and one-
half minutes. In complying with this
paragraph, the power-control lever
must be moved from one extreme posi-
tion to the other in not more than one
second, except that, if different re-
gimes of control operations are incor-
porated necessitating scheduling of the
power-control lever motion in going
from one extreme position to the other,
a longer period of time is acceptable,
but not more than two seconds.
(6)
Starts.
One hundred starts must be
made, of which 25 starts must be pre-
ceded by at least a two-hour engine
shutdown. There must be at least 10
VerDate Sep<11>2014
12:50 Apr 30, 2019
Jkt 247046
PO 00000
Frm 00739
Fmt 8010
Sfmt 8010
Y:\SGML\247046.XXX
247046
spaschal on DSK3GDR082PROD with CFR