spaschal on DSK3GDR082PROD with CFR Section 33.87 14 CFR Ch. I (1-1-19 Edition) (b)(2) of this section, or of the 30 minutes at 30-minute OEI power test period of paragraph (c)(4) of this section, or of the l hour at continuous OEI power test period of paragraph (d)(3) of this section, must be run at 21-2-minute OEI power. (f) Rotorcraft Engines for which 30-second OEI and 2-minute OEI ratings are desired. For each rotorcraft engine for which 30-second OEI and 2-minute OEI power ratings are desired, and following completion of the tests under paragraphs (b), (c), (d), or (e) of this section, the applicant may disassemble the tested engine to the extent necessary to show compliance with the requirements of Section 33.93(a). The tested engine must then be reassembled using the same parts used during the test runs of paragraphs (b), (c), (d), or (e) of this section, except those parts described as consumables in the Instructions for Continued Airworthiness. Additionally, the tests required in paragraphs (f)(1) through (f)(8) of this section must be run continuously. If a stop occurs during these tests, the interrupted sequence must be repeated unless the applicant shows that the severity of the test would not be reduced if it were continued. The applicant must conduct the following test sequence four times, for a total time of not less than 120 minutes: (1) Takeoff power. Three minutes at rated takeoff power. (2) 30-second OEI power. Thirty seconds at rated 30-second OEI power. (3) 2-minute OEI power. Two minutes at rated 2-minute OEI power. (4) 30-minute OEI power, continuous OEI power, or maximum continuous power. Five minutes at whichever is the greatest of rated 30-minute OEI power, rated continuous OEI power, or rated maximum continuous power, except that, during the first test sequence, this period shall be 65 minutes. However, where the greatest rated power is 30-minute OEI power, that sixty-five minute period shall consist of 30 minutes at 30-minute OEI power followed by 35 minutes at whichever is the greater of continuous OEI power or maximum continuous power. (5) 50 percent takeoff power. One minute at 50 percent takeoff power. (6) 30-second OEI power. Thirty seconds at rated 30-second OEI power. (7) 2-minute OEI power. Two minutes at rated 2-minute OEI power. (8) Idle. One minute at flight idle. (g) Supersonic aircraft engines. For each engine type certificated for use on supersonic aircraft the applicant must conduct the following: (1) Subsonic test under sea level ambient atmospheric conditions. Thirty runs of one hour each must be made, consisting of - (i) Two periods of 5 minutes at rated takeoff augmented thrust each followed by 5 minutes at idle thrust; (ii) One period of 5 minutes at rated takeoff thrust followed by 5 minutes at not more than 15 percent of rated takeoff thrust; (iii) One period of 10 minutes at rated takeoff augmented thrust followed by 2 minutes at idle thrust, except that if rated maximum continuous augmented thrust is lower than rated takeoff augmented thrust, 5 of the 10-minute periods must be at rated maximum continuous augmented thrust; and (iv) Six periods of 1 minute at rated takeoff augmented thrust each followed by 2 minutes, including acceleration and deceleration time, at idle thrust. (2) Simulated supersonic test. Each run of the simulated supersonic test must be preceded by changing the inlet air temperature and pressure from that attained at subsonic condition to the temperature and pressure attained at supersonic velocity, and must be followed by a return to the temperature attained at subsonic condition. Thirty runs of 4 hours each must be made, consisting of - (i) One period of 30 minutes at the thrust obtained with the power control lever set at the position for rated maximum continuous augmented thrust followed by 10 minutes at the thrust obtained with the power control lever set at the position for 90 percent of rated maximum continuous augmented thrust. The end of this period in the first five runs must be made with the induction air temperature at the limiting condition of transient overtemperature, but need not be repeated 732 VerDate Sep<11>2014 12:50 Apr 30, 2019 Jkt 247046 PO 00000 Frm 00742 Fmt 8010 Sfmt 8010 Y:\SGML\247046.XXX 247046