736
14 CFR Ch. I (1–1–19 Edition)
§ 33.96
speed and power specified by the appli-
cant for reverse pitch operation.
[Doc. No. 3025, 29 FR 7453, June 10, 1964, as
amended by Amdt. 33–3, 32 FR 3737, Mar. 4,
1967]
§ 33.96
Engine tests in auxiliary power
unit (APU) mode.
If the engine is designed with a pro-
peller brake which will allow the pro-
peller to be brought to a stop while the
gas generator portion of the engine re-
mains in operation, and remain stopped
during operation of the engine as an
auxiliary power unit (‘‘APU mode’’), in
addition to the requirements of § 33.87,
the applicant must conduct the fol-
lowing tests:
(a) Ground locking: A total of 45
hours with the propeller brake engaged
in a manner which clearly dem-
onstrates its ability to function with-
out adverse effects on the complete en-
gine while the engine is operating in
the APU mode under the maximum
conditions of engine speed, torque,
temperature, air bleed, and power ex-
traction as specified by the applicant.
(b) Dynamic braking: A total of 400
application-release cycles of brake en-
gagements must be made in a manner
which clearly demonstrates its ability
to function without adverse effects on
the complete engine under the max-
imum conditions of engine accelera-
tion/deceleration rate, speed, torque,
and temperature as specified by the ap-
plicant. The propeller must be stopped
prior to brake release.
(c) One hundred engine starts and
stops with the propeller brake engaged.
(d) The tests required by paragraphs
(a), (b), and (c) of this section must be
performed on the same engine, but this
engine need not be the same engine
used for the tests required by § 33.87.
(e) The tests required by paragraphs
(a), (b), and (c) of this section must be
followed by engine disassembly to the
extent necessary to show compliance
with the requirements of § 33.93(a) and
§ 33.93(b).
[Amdt. 33–11, 51 FR 10346, Mar. 25, 1986]
§ 33.97
Thrust reversers.
(a) If the engine incorporates a re-
verser, the endurance calibration, oper-
ation, and vibration tests prescribed in
this subpart must be run with the re-
verser installed. In complying with this
section, the power control lever must
be moved from one extreme position to
the other in not more than one second
except, if regimes of control operations
are incorporated necessitating sched-
uling of the power-control lever motion
in going from one extreme position to
the other, a longer period of time is ac-
ceptable but not more than three sec-
onds. In addition, the test prescribed in
paragraph (b) of this section must be
made. This test may be scheduled as
part of the endurance run.
(b) 175 reversals must be made from
flight-idle forward thrust to maximum
reverse thrust and 25 reversals must be
made from rated takeoff thrust to max-
imum reverse thrust. After each rever-
sal the reverser must be operated at
full reverse thrust for a period of one
minute, except that, in the case of a re-
verser intended for use only as a brak-
ing means on the ground, the reverser
need only be operated at full reverse
thrust for 30 seconds.
[Doc. No. 3025, 29 FR 7453, June 10, 1964, as
amended by Amdt. 33–3, 32 FR 3737, Mar. 4,
1967]
§ 33.99
General conduct of block tests.
(a) Each applicant may, in making a
block test, use separate engines of
identical design and construction in
the vibration, calibration, endurance,
and operation tests, except that, if a
separate engine is used for the endur-
ance test it must be subjected to a cali-
bration check before starting the en-
durance test.
(b) Each applicant may service and
make minor repairs to the engine dur-
ing the block tests in accordance with
the service and maintenance instruc-
tions submitted in compliance with
§ 33.4. If the frequency of the service is
excessive, or the number of stops due
to engine malfunction is excessive, or a
major repair, or replacement of a part
is found necessary during the block
tests or as the result of findings from
the teardown inspection, the engine or
its parts must be subjected to any addi-
tional tests the Administrator finds
necessary.
(c) Each applicant must furnish all
testing facilities, including equipment
VerDate Sep<11>2014
12:50 Apr 30, 2019
Jkt 247046
PO 00000
Frm 00746
Fmt 8010
Sfmt 8010
Y:\SGML\247046.XXX
247046
spaschal on DSK3GDR082PROD with CFR