Federal Aviation Administration, DOT Pt. 60, App. C support qualification of the FFS at the level requested. d. As required by Section 60.13(f), the sponsor must notify the NSPM when it becomes aware that an addition to, an amendment to, or a revision of data that may relate to FFS performance or handling characteristics is available. The data referred to in this paragraph is data used to validate the performance, handling qualities, or other characteristics of the aircraft, including data related to any relevant changes occurring after the type certificate was issued. The sponsor must - (1) Within 10 calendar days, notify the NSPM of the existence of this data; and (2) Within 45 calendar days, notify the NSPM of - (a) The schedule to incorporate this data into the FFS; or (b) The reason for not incorporating this data into the FFS. e. In those cases where the objective test results authorize a - snapshot test - or a - series of snapshot test results - in lieu of a time-history result, the sponsor or other data provider must ensure that a steady state condition exists at the instant of time captured by the - snapshot. - The steady state condition must exist from 4 seconds prior to, through 1 second following, the instant of time captured by the snap shot. methods require further explanations. It should also provide a brief narrative describing the cause and effect of any deviation from data requirements. The aircraft manufacturer may provide this document. h. There is no requirement for any flight test data supplier to submit a flight test plan or program prior to gathering flight test data. However, the NSPM notes that inexperienced data gatherers often provide data that is irrelevant, improperly marked, or lacking adequate justification for selection. Other problems include inadequate information regarding initial conditions or test maneuvers. The NSPM has been forced to refuse these data submissions as validation data for an FFS evaluation. It is for this reason that the NSPM recommends that any data supplier not previously experienced in this area review the data necessary for programming and for validating the performance of the FFS, and discuss the flight test plan anticipated for acquiring such data with the NSPM well in advance of commencing the flight tests. i. The NSPM will consider, on a case-bycase basis, whether to approve supplemental validation data derived from flight data recording systems such as a Quick Access Recorder or Flight Data Recorder. END QPS REQUIREMENTS 10. SPECIAL EQUIPMENT AND PERSONNEL REQUIREMENTS FOR QUALIFICATION OF THE FFS (Section 60.14) lllllllllllllllllllllll END INFORMATION kpayne on VMOFRWIN702 with $$_JOB BEGIN INFORMATION lllllllllllllllllllllll f. The FFS sponsor is encouraged to maintain a liaison with the manufacturer of the aircraft being simulated (or with the holder of the aircraft type certificate for the aircraft being simulated if the manufacturer is no longer in business), and, if appropriate, with the person who supplied the aircraft data package for the FFS in order to facilitate the notification required by Section 60.13(f). g. It is the intent of the NSPM that for new aircraft entering service, at a point well in advance of preparation of the QTG, the sponsor should submit to the NSPM for approval, a descriptive document (see Table C2D, Sample Validation Data Roadmap for Helicopters) containing the plan for acquiring the validation data, including data sources. This document should clearly identify sources of data for all required tests, a description of the validity of these data for a specific engine type and thrust rating configuration, and the revision levels of all avionics affecting the performance or flying qualities of the aircraft. Additionally, this document should provide other information, such as the rationale or explanation for cases where data or data parameters are missing, instances where engineering simulation data are used or where flight test BEGIN INFORMATION a. In the event that the NSPM determines that special equipment or specifically qualified persons will be required to conduct an evaluation, the NSPM will make every attempt to notify the sponsor at least one (1) week, but in no case less than 72 hours, in advance of the evaluation. Examples of special equipment include spot photometers, flight control measurement devices, and sound analyzers. Examples of specially qualified personnel include individuals specifically qualified to install or use any special equipment when its use is required. b. Examples of a special evaluation include an evaluation conducted after an FFS is moved, at the request of the TPAA, or as a result of comments received from users of the FFS that raise questions about the continued qualification or use of the FFS. END INFORMATION lllllllllllllllllllllll 11. INITIAL (AND UPGRADE) QUALIFICATION REQUIREMENTS (Section 60.15) lllllllllllllllllllllll 319 VerDate Sep<11>2014 16:30 Jun 25, 2019 Jkt 247047 PO 00000 Frm 00329 Fmt 8010 Sfmt 8002 Q:\14\14V2.TXT PC31