kpayne on VMOFRWIN702 with $$_JOB Pt. 60, App. D 14 CFR Ch. I (1-1-19 Edition) (1) For a new airport runway, a runway extension, a new airport taxiway, a taxiway extension, or a runway/taxiway closure - within 90 days of the opening for use of the new airport runway, runway extension, new airport taxiway, or taxiway extension; or within 90 days of the closure of the runway or taxiway. (2) For a new or modified approach light system - within 45 days of the activation of the new or modified approach light system. (3) For other facility or structural changes on the airport (e.g., new terminal, relocation of Air Traffic Control Tower) - within 180 days of the opening of the new or changed facility or structure. g. If a sponsor desires an extension to the time limit for an update to a visual scene or airport model or has an objection to what must be updated in the specific airport model requirement, the sponsor must provide a written extension request to the NPSM stating the reason for the update delay and a proposed completion date or provide an explanation for the objection, explaining why the identified airport change will not have an impact on flight training, testing, or checking. A copy of this request or objection must also be sent to the POI/ TCPM. The NSPM will send the official response to the sponsor and a copy to the POI/ TCPM; however, if there is an objection, after consultation with the appropriate POI/ TCPM regarding the training, testing, or checking impact, the NSPM will send the official response to the sponsor and a copy to the POI/TCPM. h. Examples of situations that may warrant ClasslIII model designation by the TPAA include the following: (a) Training, testing, or checking on very low visibility operations, including SMGCS operations. (b) Instrument operations training (including instrument takeoff, departure, arrival, approach, and missed approach training, testing, or checking) using - (i) A specific model that has been geographically - moved - to a different location and aligned with an instrument procedure for another airport. (ii) A model that does not match changes made at the real-world airport (or landing area for helicopters) being modeled. (iii) A model generated with an - off-board - or an - on-board - model development tool (by providing proper latitude/longitude reference; correct runway or landing area orientation, length, width, marking, and lighting information; and appropriate adjacent taxiway location) to generate a facsimile of a real world airport or landing area. These airport models may be accepted by the TPAA without individual observation provided the sponsor provides the TPAA with an acceptable description of the process for determining the acceptability of a spe- cific airport model, outlines the conditions under which such an airport model may be used, and adequately describes what restrictions will be applied to each resulting airport or landing area model. END QPS REQUIREMENTS lllllllllllllllllllllll BEGIN INFORMATION 2. DISCUSSION a. The subjective tests and the examination of functions provide a basis for evaluating the capability of the FTD to perform over a typical utilization period; determining that the FTD satisfactorily meets the appropriate training/testing/checking objectives and competently simulates each required maneuver, procedure, or task; and verifying correct operation of the FTD controls, instruments, and systems. The items in the list of operations tasks are for FTD evaluation purposes only. They must not be used to limit or exceed the authorizations for use of a given level of FTD as found in the Practical Test Standards or as approved by the TPAA. All items in the following paragraphs are subject to an examination of function. b. The List of Operations Tasks in Table D3A addressing pilot functions and maneuvers is divided by flight phases. All simulated helicopter systems functions will be assessed for normal and, where appropriate, alternate operations. Normal, abnormal, and emergency operations associated with a flight phase will be assessed during the evaluation of maneuvers or events within that flight phase. c. Systems to be evaluated are listed separately under - Any Flight Phase - to ensure appropriate attention to systems checks. Operational navigation systems (including inertial navigation systems, global positioning systems, or other long-range systems) and the associated electronic display systems will be evaluated if installed. The NSP pilot will include in his report to the TPAA, the effect of the system operation and any system limitation. d. At the request of the TPAA, the NSP Pilot may assess the FTD for a special aspect of a sponsor-s training program during the functions and subjective portion of an evaluation. Such an assessment may include a portion of a specific operation (e.g., a Line Oriented Flight Training (LOFT) scenario) or special emphasis items in the sponsor-s training program. Unless directly related to a requirement for the qualification level, the results of such an evaluation would not necessarily affect the qualification of the FTD. e. The FAA intends to allow the use of Class III airport models on a limited basis when the sponsor provides the TPAA (or other regulatory authority) an appropriate 460 VerDate Sep<11>2014 16:30 Jun 25, 2019 Jkt 247047 PO 00000 Frm 00470 Fmt 8010 Sfmt 8002 Q:\14\14V2.TXT PC31