490
14 CFR Ch. I (1–1–19 Edition)
Pt. 60, App. E
[Doc. No. FAA–2002–12461, 73 FR 26490, May 9, 2008, as amended by Amdt. 60–6, 83 FR 3027, June
27, 2018]
A
PPENDIX
E
TO
P
ART
60—Q
UALIFICATION
P
ERFORMANCE
S
TANDARDS
FOR
Q
UALITY
M
ANAGEMENT
S
YSTEMS FOR
F
LIGHT
S
IMULATION
T
RAINING
D
E
-
VICES
lllllllllllllllllllllll
B
EGIN
QPS R
EQUIREMENTS
a. Not later than May 30, 2010, each current
sponsor of an FSTD must submit to the
NSPM a proposed Quality Management Sys-
tem (QMS) program as described in this ap-
pendix. The NSPM will notify the sponsor of
the acceptability of the program, including
any required adjustments. Within 6 months
of the notification of acceptability, the spon-
sor must implement the program, conduct
internal audits, make required program ad-
justments as a result of any internal audit,
and schedule the NSPM initial audit.
b. First-time FSTD sponsors must submit
to the NSPM the proposed QMS program no
later than 120 days before the initial FSTD
evaluation. The NSPM will notify the spon-
sor of the acceptability of the program, in-
cluding any required adjustments. Within 6
months of the notification of acceptability,
the sponsor must implement the program,
conduct internal audits, make required pro-
gram adjustments as a result of any internal
audit, and schedule the NSPM initial audit.
c. The Director of Operations for a Part 119
certificate holder, the Chief Instructor for a
Part 141 certificate holder, or the equivalent
for a Part 142 or Flight Engineer School
sponsor must designate a Management Rep-
resentative (MR) who has the authority to
establish and modify the sponsor’s policies,
practices, and procedures regarding the QMS
program for the recurring qualification and
the daily use of each FSTD.
d. The minimum content required for an
acceptable QMS is found in Table E1. The
policies, processes, or procedures described
in this table must be maintained in a Qual-
ity Manual and will serve as the basis for the
following:
(1) The sponsor-conducted initial and re-
curring periodic assessments;
(2) The NSPM-conducted initial and recur-
ring periodic assessments; and
VerDate Sep<11>2014
16:30 Jun 25, 2019
Jkt 247047
PO 00000
Frm 00500
Fmt 8010
Sfmt 8002
Q:\14\14V2.TXT
PC31
ER09MY08.066</GPH>
kpayne on VMOFRWIN702 with $$_JOB