Federal Aviation Administration, DOT Section 65.93 a major repair or major alteration for products that are not produced under an FAA approval, provided the work was performed in accordance with instructions developed by the manufacturer or a person acceptable to the FAA. (5) Pass a written test on his ability to inspect according to safety standards for returning aircraft to service after major repairs and major alterations and annual and progressive inspections performed under part 43 of this chapter. [Doc. No. 1179, 27 FR 7973, Aug. 10, 1962, as amended by Amdt. 65-10, 32 FR 5770, Apr. 11, 1967; Amdt. 65-45, 69 FR 44879, July 27, 2004] An applicant who fails the test prescribed in paragraph (c)(5) of this section may not apply for retesting until at least 90 days after the date he failed the test. Section 65.89 Display of certificate. Each person who holds a mechanic certificate shall keep it within the immediate area where he normally exercises the privileges of the certificate and shall present it for inspection upon the request of the Administrator or an authorized representative of the National Transportation Safety Board, or of any Federal, State, or local law enforcement officer. [Doc. No. 7258, 31 FR 13524, Oct. 20, 1966, as amended by Doc. No. 8084, 32 FR 5769, Apr. 11, 1967] kpayne on VMOFRWIN702 with $$_JOB Section 65.91 Inspection authorization. (a) An application for an inspection authorization is made on a form and in a manner prescribed by the Administrator. (b) An applicant who meets the requirements of this section is entitled to an inspection authorization. (c) To be eligible for an inspection authorization, an applicant must - (1) Hold a currently effective mechanic certificate with both an airframe rating and a powerplant rating, each of which is currently effective and has been in effect for a total of at least 3 years; (2) Have been actively engaged, for at least the 2-year period before the date he applies, in maintaining aircraft certificated and maintained in accordance with this chapter; (3) Have a fixed base of operations at which he may be located in person or by telephone during a normal working week but it need not be the place where he will exercise his inspection authority; (4) Have available to him the equipment, facilities, and inspection data necessary to properly inspect airframes, powerplants, propellers, or any related part or appliance; and [Doc. No. 1179, 27 FR 7973, Aug. 10, 1962, as amended by Amdt. 65-5, 31 FR 3337, Mar. 3, 1966; Amdt. 65-22, 42 FR 46279, Sept. 15, 1977; Amdt. 65-30, 50 FR 15700, Apr. 19, 1985] Section 65.92 Inspection authorization: Duration. (a) Each inspection authorization expires on March 31 of each odd-numbered year. However, the holder may exercise the privileges of that authorization only while he holds a currently effective mechanic certificate with both a currently effective airframe rating and a currently effective powerplant rating. (b) An inspection authorization ceases to be effective whenever any of the following occurs: (1) The authorization is surrendered, suspended, or revoked. (2) The holder no longer has a fixed base of operation. (3) The holder no longer has the equipment, facilities, and inspection data required by Section 65.91(c) (3) and (4) for issuance of his authorization. (c) The holder of an inspection authorization that is suspended or revoked shall, upon the Administrator-s request, return it to the Administrator. [Doc. No. 12537, 42 FR 46279, Sept. 15, 1977, as amended by Amdt. 65-50, 72 FR 4404, Jan. 30, 2007] Section 65.93 Inspection authorization: Renewal. (a) To be eligible for renewal of an inspection authorization for a 2-year period an applicant must present evidence during the month of March of each odd-numbered year, at the responsible Flight Standards office, that the applicant still meets the requirements of Section 65.91(c) (1) through (4). In addition, during the time the applicant held the 661 VerDate Sep<11>2014 16:30 Jun 25, 2019 Jkt 247047 PO 00000 Frm 00671 Fmt 8010 Sfmt 8002 Q:\14\14V2.TXT PC31