Federal Aviation Administration, DOT Section 77.9 Utility runway means a runway that is constructed for and intended to be used by propeller driven aircraft of 12,500 pounds maximum gross weight and less. Visual runway means a runway intended solely for the operation of aircraft using visual approach procedures, with no straight-in instrument approach procedure and no instrument designation indicated on an FAA-approved airport layout plan, a military service approved military airport layout plan, or by any planning document submitted to the FAA by competent authority. Subpart B - Notice Requirements kpayne on VMOFRWIN702 with $$_JOB Section 77.5 Applicability. (a) If you propose any construction or alteration described in Section 77.9, you must provide adequate notice to the FAA of that construction or alteration. (b) If requested by the FAA, you must also file supplemental notice before the start date and upon completion of certain construction or alterations that are described in Section 77.9. (c) Notice received by the FAA under this subpart is used to: (1) Evaluate the effect of the proposed construction or alteration on safety in air commerce and the efficient use and preservation of the navigable airspace and of airport traffic capacity at public use airports; (2) Determine whether the effect of proposed construction or alteration is a hazard to air navigation; (3) Determine appropriate marking and lighting recommendations, using FAA Advisory Circular 70/7460-1, Obstruction Marking and Lighting; (4) Determine other appropriate measures to be applied for continued safety of air navigation; and (5) Notify the aviation community of the construction or alteration of objects that affect the navigable airspace, including the revision of charts, when necessary. Section 77.7 Form and time of notice. (a) If you are required to file notice under Section 77.9, you must submit to the FAA a completed FAA Form 7460-1, Notice of Proposed Construction or Alteration. FAA Form 7460-1 is available at FAA regional offices and on the Internet. (b) You must submit this form at least 45 days before the start date of the proposed construction or alteration or the date an application for a construction permit is filed, whichever is earliest. (c) If you propose construction or alteration that is also subject to the licensing requirements of the Federal Communications Commission (FCC), you must submit notice to the FAA on or before the date that the application is filed with the FCC. (d) If you propose construction or alteration to an existing structure that exceeds 2,000 ft. in height above ground level (AGL), the FAA presumes it to be a hazard to air navigation that results in an inefficient use of airspace. You must include details explaining both why the proposal would not constitute a hazard to air navigation and why it would not cause an inefficient use of airspace. (e) The 45-day advance notice requirement is waived if immediate construction or alteration is required because of an emergency involving essential public services, public health, or public safety. You may provide notice to the FAA by any available, expeditious means. You must file a completed FAA Form 7460-1 within 5 days of the initial notice to the FAA. Outside normal business hours, the nearest flight service station will accept emergency notices. Section 77.9 Construction or alteration requiring notice. If requested by the FAA, or if you propose any of the following types of construction or alteration, you must file notice with the FAA of: (a) Any construction or alteration that is more than 200 ft. AGL at its site. (b) Any construction or alteration that exceeds an imaginary surface extending outward and upward at any of the following slopes: (1) 100 to 1 for a horizontal distance of 20,000 ft. from the nearest point of the nearest runway of each airport described in paragraph (d) of this section with its longest runway more than 695 VerDate Sep<11>2014 16:30 Jun 25, 2019 Jkt 247047 PO 00000 Frm 00705 Fmt 8010 Sfmt 8010 Q:\14\14V2.TXT PC31