background image

189 

Federal Aviation Administration, DOT 

§ 121.473 

flight time in scheduled air transpor-
tation or in other commercial flying if 
that crewmember’s total flight time in 
all commercial flying will exceed— 

(1) 1,000 hours in any calendar year; 
(2) 100 hours in any calendar month; 
(3) 30 hours in any 7 consecutive days; 
(4) 8 hours between required rest peri-

ods. 

(b) Except as provided in paragraph 

(c) of this section, no certificate holder 
conducting domestic operations may 
schedule a flight crewmember and no 
flight crewmember may accept an as-
signment for flight time during the 24 
consecutive hours preceding the sched-
uled completion of any flight segment 
without a scheduled rest period during 
that 24 hours of at least the following: 

(1) 9 consecutive hours of rest for less 

than 8 hours of scheduled flight time. 

(2) 10 consecutive hours of rest for 8 

or more but less than 9 hours of sched-
uled flight time. 

(3) 11 consecutive hours of rest for 9 

or more hours of scheduled flight time. 

(c) A certificate holder may schedule 

a flight crewmember for less than the 
rest required in paragraph (b) of this 
section or may reduce a scheduled rest 
under the following conditions: 

(1) A rest required under paragraph 

(b)(1) of this section may be scheduled 
for or reduced to a minimum of 8 hours 
if the flight crewmember is given a rest 
period of at least 10 hours that must 
begin no later than 24 hours after the 
commencement of the reduced rest pe-
riod. 

(2) A rest required under paragraph 

(b)(2) of this section may be scheduled 
for or reduced to a minimum of 8 hours 
if the flight crewmember is given a rest 
period of at least 11 hours that must 
begin no later than 24 hours after the 
commencement of the reduced rest pe-
riod. 

(3) A rest required under paragraph 

(b)(3) of this section may be scheduled 
for or reduced to a minimum of 9 hours 
if the flight crewmember is given a rest 
period of at least 12 hours that must 
begin no later than 24 hours after the 
commencement of the reduced rest pe-
riod. 

(4) No certificate holder may assign, 

nor may any flight crewmember per-
form any flight time with the certifi-
cate holder unless the flight crew-

member has had at least the minimum 
rest required under this paragraph. 

(d) Each certificate holder con-

ducting domestic operations shall re-
lieve each flight crewmember engaged 
in scheduled air transportation from 
all further duty for at least 24 consecu-
tive hours during any 7 consecutive 
days. 

(e) No certificate holder conducting 

domestic operations may assign any 
flight crewmember and no flight crew-
member may accept assignment to any 
duty with the air carrier during any re-
quired rest period. 

(f) Time spent in transportation, not 

local in character, that a certificate 
holder requires of a flight crewmember 
and provides to transport the crew-
member to an airport at which he is to 
serve on a flight as a crewmember, or 
from an airport at which he was re-
lieved from duty to return to his home 
station, is not considered part of a rest 
period. 

(g) A flight crewmember is not con-

sidered to be scheduled for flight time 
in excess of flight time limitations if 
the flights to which he is assigned are 
scheduled and normally terminate 
within the limitations, but due to cir-
cumstances beyond the control of the 
certificate holder (such as adverse 
weather conditions), are not at the 
time of departure expected to reach 
their destination within the scheduled 
time. 

[Doc. No. 23634, 50 FR 29319, July 18, 1985, as 
amended by Amdt. 121–253, 61 FR 2612, Jan. 
26, 1996] 

§ 121.473

Fatigue risk management 

system. 

(a) No certificate holder may exceed 

any provision of this subpart unless ap-
proved by the FAA under a Fatigue 
Risk Management System. 

(b) The Fatigue Risk Management 

System must include: 

(1) A fatigue risk management pol-

icy. 

(2) An education and awareness train-

ing program. 

(3) A fatigue reporting system. 
(4) A system for monitoring 

flightcrew fatigue. 

(5) An incident reporting process. 

VerDate Sep<11>2014 

08:20 May 17, 2019

Jkt 247048

PO 00000

Frm 00199

Fmt 8010

Sfmt 8010

Y:\SGML\247048.XXX

247048