Federal Aviation Administration, DOT Section 121.99 proved communication link that will provide reliable and rapid communications under normal operating conditions between each airplane and the appropriate dispatch office, and between each airplane and the appropriate air traffic control unit. (b) Except in an emergency, for all flag and domestic kinds of operations, the communications systems between each airplane and the dispatch office must be independent of any system operated by the United States. (c) Each certificate holder conducting flag operations must provide voice communications for ETOPS where voice communication facilities are available. In determining whether facilities are available, the certificate holder must consider potential routes and altitudes needed for diversion to ETOPS Alternate Airports. Where facilities are not available or are of such poor quality that voice communication is not possible, another communication system must be substituted. (d) Except as provided in paragraph (e) of this section, after February 15, 2008 for ETOPS beyond 180 minutes, each certificate holder conducting flag operations must have a second communication system in addition to that required by paragraph (c) of this section. That system must be able to provide immediate satellite-based voice communications of landline-telephone fidelity. The system must be able to communicate between the flight crew and air traffic services, and the flight crew and the certificate holder. In determining whether such communications are available, the certificate holder must consider potential routes and altitudes needed for diversion to ETOPS Alternate Airports. Where immediate, satellite-based voice communications are not available, or are of such poor quality that voice communication is not possible, another communication system must be substituted. (e) Operators of two-engine turbinepowered airplanes with 207 minute ETOPS approval in the North Pacific Area of Operation must comply with (4) Obstacles. (i) Those affecting takeoff and landing performance computations in accordance with Subpart I of this part. (ii) Controlling obstacles. (5) Instrument flight procedures. (i) Departure procedure. (ii) Approach procedure. (iii) Missed approach procedure. (6) Special information. (i) Runway visual range measurement equipment. (ii) Prevailing winds under low visibility conditions. (c) If the responsible Flight Standards office charged with the overall inspection of the certificate holder-s operations finds that revisions are necessary for the continued adequacy of the certificate holder-s system for collection, dissemination, and usage of aeronautical data that has been granted approval, the certificate holder shall, after notification by the responsible Flight Standards office, make those revisions in the system. Within 30 days after the certificate holder receives such notice, the certificate holder may file a petition to reconsider the notice with the Executive Director, Flight Standards Service. This filing of a petition to reconsider stays the notice pending a decision by the Executive Director, Flight Standards Service. However, if the responsible Flight Standards office finds that there is an emergency that requires immediate action in the interest of safety in air transportation, the Executive Director, Flight Standards Service may, upon statement of the reasons, require a change effective without stay. [Doc. No. 6258, 29 FR 19194, Dec. 31, 1964, as amended by Amdt. 121-162, 45 FR 46738, July 10, 1980; Amdt. 121-207, 54 FR 39293, Sept. 25, 1989; Amdt. 121-253, 61 FR 2610, Jan. 26, 1996; Amdt. 121-329, 72 FR 1878, Jan. 16, 2007; Docket FAA-2018-0119, Amdt. 121-380, 83 FR 9172, 9173, Mar. 5, 2018] Section 121.99 Communications facilities - domestic and flag operations. (a) Each certificate holder conducting domestic or flag operations must show that a two-way communication system, or other means of communication approved by the responsible Flight Standards office, is available over the entire route. The communications may be direct links or via an ap- 73 VerDate Sep<11>2014 08:20 May 17, 2019 Jkt 247048 PO 00000 Frm 00083 Fmt 8010 Sfmt 8010 Y:\SGML\247048.XXX 247048