Federal Aviation Administration, DOT Pt. 121, App. P APPENDIX P TO PART 121 - REQUIREMENTS FOR ETOPS AND POLAR OPERATIONS The FAA approves ETOPS in accordance with the requirements and limitations in this appendix. Section I. ETOPS Approvals: Airplanes with Two engines. (a) Propulsion system reliability for ETOPS. (1) Before the FAA grants ETOPS operational approval, the operator must be able to demonstrate the ability to achieve and maintain the level of propulsion system reliability, if any, that is required by Section 21.4(b)(2) of this chapter for the ETOPS-approved airplane-engine combination to be used. (2) Following ETOPS operational approval, the operator must monitor the propulsion system reliability for the airplane-engine combination used in ETOPS, and take action as required by Section 121.374(i) for the specified IFSD rates. (b) 75 Minutes ETOPS - (1) Caribbean/Western Atlantic Area. The FAA grants approvals to conduct ETOPS with maximum diversion times up to 75 minutes on Western Atlantic/Caribbean area routes as follows: (i) The FAA reviews the airplane-engine combination to ensure the absence of factors that could prevent safe operations. The airplane-engine combination need not be typedesign-approved for ETOPS; however, it must have sufficient favorable experience to demonstrate to the Administrator a level of reliability appropriate for 75-minute ETOPS. (ii) The certificate holder must comply with the requirements of Section 121.633 for timelimited system planning. (iii) The certificate holder must operate in accordance with the ETOPS authority as contained in its operations specifications. (iv) The certificate holder must comply with the maintenance program requirements of Section 121.374, except that a pre-departure service check before departure of the return flight is not required. (2) Other Areas. The FAA grants approvals to conduct ETOPS with maximum diversion times up to 75 minutes on other than Western Atlantic/Caribbean area routes as follows: (i) The FAA reviews the airplane-engine combination to ensure the absence of factors that could prevent safe operations. The airplane-engine combination need not be typedesign-approved for ETOPS; however, it must have sufficient favorable experience to demonstrate to the Administrator a level of reliability appropriate for 75-minute ETOPS. (ii) The certificate holder must comply with the requirements of Section 121.633 for timelimited system planning. (iii) The certificate holder must operate in accordance with the ETOPS authority as contained in its operations specifications. (iv) The certificate holder must comply with the maintenance program requirements of Section 121.374. (v) The certificate holder must comply with the MEL in its operations specifications for 120-minute ETOPS. (c) 90-minutes ETOPS (Micronesia). The FAA grants approvals to conduct ETOPS with maximum diversion times up to 90 minutes on Micronesian area routes as follows: (1) The airplane-engine combination must be type-design approved for ETOPS of at least 120-minutes. (2) The certificate holder must operate in accordance with the ETOPS authority as contained in its operations specifications. (3) The certificate holder must comply with the maintenance program requirements of Section 121.374, except that a pre-departure service check before departure of the return flight is not required. (4) The certificate holder must comply with the MEL requirements in its operations specifications for 120-minute ETOPS. (d) 120-minute ETOPS. The FAA grants approvals to conduct ETOPS with maximum diversion times up to 120 minutes as follows: (1) The airplane-engine combination must be type-design-approved for ETOPS of at least 120 minutes. (2) The certificate holder must operate in accordance with the ETOPS authority as contained in its operations specifications. (3) The certificate holder must comply with the maintenance program requirements of Section 121.374. (4) The certificate holder must comply with the MEL requirements for 120-minute ETOPS. (e) 138-Minute ETOPS. The FAA grants approval to conduct ETOPS with maximum diversion times up to 138 minutes as follows: (1) Operators with 120-minute ETOPS approval. The FAA grants 138-minute ETOPS approval as an extension of an existing 120minute ETOPS approval as follows: (i) The authority may be exercised only for specific flights for which the 120-minute diversion time must be exceeded. (ii) For these flight-by-flight exceptions, the airplane-engine combination must be type-design-approved for ETOPS up to at least 120 minutes. The capability of the airplane-s time-limited systems may not be less than 138 minutes calculated in accordance with Section 121.633. (iii) The certificate holder must operate in accordance with the ETOPS authority as contained in its operations specifications. (iv) The certificate holder must comply with the maintenance program requirements of Section 121.374. (v) The certificate holder must comply with minimum equipment list (MEL) requirements in its operations specifications for - beyond 120 minutes ETOPS - . Operators without a - beyond 120-minute ETOPS - MEL 307 VerDate Sep<11>2014 08:20 May 17, 2019 Jkt 247048 PO 00000 Frm 00317 Fmt 8010 Sfmt 8002 Y:\SGML\247048.XXX 247048