Section 129.107 14 CFR Ch. I (1-1-19 Edition) (3) Airplanes not exceeding 14 years in service on December 8, 2003; initial and repetitive inspections and records reviews. For an airplane that has not exceeded 14 years in service on December 8, 2003, no later than 5 years after the start of the airplane-s 15th year in service and thereafter at intervals not to exceed 7 years. (b) Unforeseen schedule conflict. In the event of an unforeseen scheduling conflict for a specific airplane, the Administrator may approve an extension of up to 90 days beyond an interval specified in paragraph (b) of this section. (c) Airplane and records availability. The foreign air carrier or foreign person must make available to the Administrator each U.S.-registered multiengine airplane for which an inspection and records review is required under this section, in a condition for inspection specified by the Administrator, together with the records containing the following information: (1) Total years in service of the airplane; (2) Total time in service of the airframe; (3) Total flight cycles of the airframe; (4) Date of the last inspection and records review required by this section; (5) Current status of life-limited parts of the airframe; (6) Time since the last overhaul of all structural components required to be overhauled on a specific time basis; (7) Current inspection status of the airplane, including the time since the last inspection required by the inspection program under which the airplane is maintained; (8) Current status of applicable airworthiness directives, including the date and methods of compliance, and if the airworthiness directive involves recurring action, the time and date when the next action is required; (9) A list of major structural alterations; and (10) A report of major structural repairs and the current inspection status for those repairs. (d) Notification to Administrator. Each foreign air carrier or foreign person must notify the Administrator at least 60 days before the date on which the airplane and airplane records will be made available for the inspection and records review. [Doc. No. FAA-1999-5401, 67 FR 72763, Dec. 6, 2002, as amended by Amdt. 129-34, 70 FR 5533, Feb. 2, 2005; Amdt. 129-41, 70 FR 23936, May 6, 2005. Redesignated by Amdt. 129-43, 72 FR 63413, Nov. 8, 2007] Section 129.107 Repairs assessment for pressurized fuselages. (a) No foreign air carrier or foreign persons operating a U.S. registered airplane may operate an Airbus Model A300 (excluding Section600 series), British Aerospace Model BAC 1-11, Boeing Model 707, 720, 727, 737, or 747, McDonnell Douglas Model DC-8, DC-9/MD-80 or DC-10, Fokker Model F28, or Lockheed Model L-1011 beyond the applicable flight cycle implementation time specified below, or May 25, 2001, whichever occurs later, unless operations specifications have been issued to reference repair assessment guidelines applicable to the fuselage pressure boundary (fuselage skin, door skin, and bulkhead webs), and those guidelines are incorporated in its maintenance program. The repair assessment guidelines must be approved by the responsible Aircraft Certification Service office for the type certificate for the affected airplane. (1) For the Airbus Model A300 (excluding the -600 series), the flight cycle implementation time is: (i) Model B2: 36,000 flights. (ii) Model B4-100 (including Model B4-2C): 30,000 flights above the window line, and 36,000 flights below the window line. (iii) Model B4-200: 25,500 flights above the window line, and 34,000 flights below the window line. (2) For all models of the British Aerospace BAC 1-11, the flight cycle implementation time is 60,000 flights. (3) For all models of the Boeing 707, the flight cycle implementation time is 15,000 flights. (4) For all models of the Boeing 720, the flight cycle implementation time is 23,000 flights. (5) For all models of the Boeing 727, the flight cycle implementation time is 45,000 flights. (6) For all models of the Boeing 737, the flight cycle implementation time is 60,00 flights. 388 VerDate Sep<11>2014 08:20 May 17, 2019 Jkt 247048 PO 00000 Frm 00398 Fmt 8010 Sfmt 8002 Y:\SGML\247048.XXX 247048