Section 142.5 14 CFR Ch. I (1-1-19 Edition) and limitations, and specifies training program requirements. [Doc. No. 26933, 61 FR 34562, July 2, 1996, as amended by Amdt. 142-2, 62 FR 68137, Dec. 30, 1997; Amdt. 142-7, 76 FR 54110, Aug. 31, 2011; Amdt. 142-9, 78 FR 42380, July 15, 2013] Section 142.5 Certificate and training specifications required. (a) No person may operate a certificated training center without, or in violation of, a training center certificate and training specifications issued under this part. (b) An applicant will be issued a training center certificate and training specifications with appropriate limitations if the applicant shows that it has adequate facilities, equipment, personnel, and courseware required by Section 142.11 to conduct training approved under Section 142.37. Section 142.7 Duration of a certificate. (a) Except as provided in paragraph (b) of this section, a training center certificate issued under this part is effective until the certificate is surrendered or until the Administrator suspends, revokes, or terminates it. (b) Unless sooner surrendered, suspended, or revoked, a certificate issued under this part for a training center located outside the United States expires at the end of the twelfth month after the month in which it is issued or renewed. (c) If the Administrator suspends, revokes, or terminates a training center certificate, the holder of that certificate shall return the certificate to the Administrator within 5 working days after being notified that the certificate is suspended, revoked, or terminated. Section 142.9 Deviations or waivers. (a) The Administrator may issue deviations or waivers from any of the requirements of this part. (b) A training center applicant requesting a deviation or waiver under this section must provide the Administrator with information acceptable to the Administrator that shows - (1) Justification for the deviation or waiver; and (2) That the deviation or waiver will not adversely affect the quality of instruction or evaluation. Section 142.11 Application for issuance or amendment. (a) An application for a training center certificate and training specifications shall - (1) Be made on a form and in a manner prescribed by the Administrator; (2) Be filed with the responsible Flight Standards office for the area in which the applicant-s principal business office is located; and (3) Be made at least 120 calendar days before the beginning of any proposed training or 60 calendar days before effecting an amendment to any approved training, unless a shorter filing period is approved by the Administrator. (b) Each application for a training center certificate and training specification shall provide - (1) A statement showing that the minimum qualification requirements for each management position are met or exceeded; (2) A statement acknowledging that the applicant shall notify the Administrator within 10 working days of any change made in the assignment of persons in the required management positions; (3) The proposed training authorizations and training specifications requested by the applicant; (4) The proposed evaluation authorization; (5) A description of the flight training equipment that the applicant proposes to use; (6) A description of the applicant-s training facilities, equipment, qualifications of personnel to be used, and proposed evaluation plans; (7) A training program curriculum, including syllabi, outlines, courseware, procedures, and documentation to support the items required in subpart B of this part, upon request by the Administrator; (8) A description of a recordkeeping system that will identify and document the details of training, qualification, and certification of students, instructors, and evaluators; (9) A description of quality control measures proposed; and (10) A method of demonstrating the applicant-s qualification and ability to provide training for a certificate or rating in fewer than the minimum 626 VerDate Sep<11>2014 08:20 May 17, 2019 Jkt 247048 PO 00000 Frm 00636 Fmt 8010 Sfmt 8010 Y:\SGML\247048.XXX 247048