§ 152.111
(4) If the project has been determined
to have areawide significance by an ap-
propriate areawide agency, it has been
incorporated into a unified planning
work program; and
(5) In the case of a proposed project
for airport master planning in a large
or medium air traffic hub, in the opin-
ion of the Administrator—
(i) There is an appropriate system
plan identifying the need for the air-
port;
(ii) The absence of a system plan is
due to the failure of the responsible
planning agency to proceed with its
preparation; or
(iii) An existing system plan is not
acceptable.
(b)
Airport system planning.
A pro-
posed project for airport system plan-
ning is not approved unless—
(1) In the opinion of the Adminis-
trator, the project promotes the effec-
tive location of public airports;
(2) In the opinion of the Adminis-
trator, the project promotes the devel-
opment of an adequate NASP;
(3) The project is airport system
planning as defined in § 152.3; and
(4) When the project encompasses a
metropolitan area that includes a large
or medium hub airport, the project is
incorporated in a unified planning
work program.
§ 152.111
Application requirements:
Airport development.
(a) An eligible sponsor that desires to
obtain Federal aid for eligible airport
development must apply to the FAA in
accordance with this section. The spon-
sor must apply on a form and in a man-
ner prescribed by the Administrator,
through the FAA Airports District Of-
fice or Airports Field Office having ju-
risdiction over the area where the
sponsor is located or, where there is no
such office, the Regional Office having
that jurisdiction.
(b)
Preapplication for Federal assist-
ance.
A preapplication for Federal as-
sistance must be submitted unless—
(1) The Federal fund request is for
$100,000 or less; or,
(2) The project does not include con-
struction, land acquisition, or land im-
provement.
(c) Unless otherwise authorized by
the Administrator, the preapplication
required by paragraph (b) of this sec-
tion must be accompanied by the fol-
lowing:
(1) A list of the items of airport de-
velopment requested for programming,
together with an itemized estimated
cost of the work involved.
(2) A sketch or sketches of the air-
port layout indicating the location for
each item of work proposed, using the
same item numbers used in the list re-
quired by paragraph (c)(1) of this sec-
tion.
(3) If the proposed project involves
the displacement of persons or the ac-
quisition of real property, the assur-
ances required by §§ 25.57 and 25.59, as
applicable, of the Regulations of the
Office of the Secretary of Transpor-
tation (49 CFR 25.57 and 25.59), whether
or not reimbursement is being re-
quested for the costs of displacement
or real property acquisition.
(4) Any comments or statements re-
quired by appendix E, Procedures Im-
plementing Office of Management and
Budget Circular A–95, to this part, with
a showing that they have been consid-
ered by the sponsor.
(5) If the proposed development in-
volves the construction of eligible air-
port buildings or the acquisition of eli-
gible fixed equipment to be contained
in those buildings, a statement wheth-
er the proposed development will be in
an area of the community that has
been identified by the Department of
Housing and Urban Development as an
area of special flood hazard as defined
in the Flood Disaster Protection Act of
1973 (42 U.S.C. 4002
et seq.
).
(6) If the proposed development is in
an area of special flood hazard, a state-
ment whether the community is par-
ticipating in the National Flood Insur-
ance Program (42 U.S.C. 4011
et seq.
).
(7) The sponsor’s environmental as-
sessment prepared in conformance with
appendix 6 of FAA Order 1050.1C,
‘‘Policies and Procedures for Consid-
ering Environmental Impacts’’ (45 FR
2244; Jan. 10, 1980), and FAA Order
5050.4, ‘‘Airport Environmental Hand-
book’’ (45 FR 56624; Aug. 24, 1980), if an
assessment is required by Order 5050.4.
Copies of these orders may be exam-
ined in the Rules Docket, Office of the
Chief Counsel, FAA, Washington, D.C.,
and may be obtained on request at any
VerDate Sep<11>2014
08:20 May 17, 2019
Jkt 247048
PO 00000
Frm 00727
Fmt 8010
Sfmt 8010
Y:\SGML\247048.XXX
247048