14 CFR Ch. I (1–1–19 Edition)
§ 152.111
FAA regional office headquarters or
any airports district office.
(8) A showing that the sponsor has
complied with the public hearing re-
quirements in § 152.117.
(9) In the case of a proposed new air-
port serving any area that does not in-
clude a metropolitan area, a showing
that each community in which the pro-
posed airport is to be located has ap-
proved the proposed airport site
through the body having general legis-
lative jurisdiction over it.
(10) In the case of a proposed project
at an air carrier airport, a statement
that the sponsor, in making the deci-
sion to undertake the project, has con-
sulted with air carriers using the air-
port.
(11) In the case of a proposed project
at a general aviation airport, a state-
ment that the sponsor, in making the
decision to undertake the project, has
consulted with fixed-base operators
using the airport.
(12) In the case of terminal develop-
ment, a certification that the airport
has, or will have, all safety and secu-
rity equipment required for certifi-
cation of the airport under part 139 and
has provided, or will provide, for access
to the passenger enplaning and
deplaning area to passengers enplaning
or deplaning from aircraft other than
air carrier aircraft.
(d)
Allocation of funds.
If the proposed
project for airport development is se-
lected by the Administrator for inclu-
sion in a program, a tentative alloca-
tion of funds is made for the project
and the sponsor is notified of the allo-
cation. The tentative allocation may
be withdrawn if the sponsor does not
submit a project application in accord-
ance with paragraph (f) of this section.
(e)
Application for Federal assistance.
As soon as practicable after receiving
notice of a tentative allocation or, if a
preapplication is not required (as pro-
vided in paragraph (b) of this section),
an application for Federal assistance
must be submitted.
(f) Unless otherwise authorized by
the Administrator, the application re-
quired by paragraph (e) of this section
must be accompanied by the following:
(1) When a preapplication has not
been previously submitted, the infor-
mation required by paragraph (c) of
this section.
(2) A property map of the airport
showing—
(i) The property interests of each
sponsor in all the lands to be developed
or used as part of, or in connection
with, the airport as it will be when the
project is completed; and
(ii) All property interests acquired or
to be acquired, for which U.S. aid is re-
quested under the project.
(3) With respect to all lands to be de-
veloped or used as a part of, or in con-
nection with, the airport (as it will be
when the project is completed) in
which a satisfactory property interest
is not held by a sponsor, a covenant by
the sponsor that it will obtain a satis-
factory property interest before con-
struction is begun or within a reason-
able time if not needed for construc-
tion.
(4) If the proposed project involves
the displacement of persons, the relo-
cation plan required by § 25.55 of the
Regulations of the Office of the Sec-
retary of Transportation.
(5) When the project involves an air-
port location, a runway location, or a
major runway extension, a written cer-
tification from the Governor of the
state in which the project may be lo-
cated (or a delegatee), providing rea-
sonable assurance that the project will
be located, designed, constructed, and
operated so as to comply with applica-
ble air and water quality standards.
(6) A statement whether any build-
ing, installation, structure, location,
or site of operations to be utilized in
the performance of the grant or any
contract made pursuant to the grant
appears on the list of violating facili-
ties distributed by the Environmental
Protection Agency under the provi-
sions of the Clean Air Act and Federal
Water Pollution Control Act (40 CFR
part 15).
(7) The assurances on Civil Rights re-
quired by § 21.7 of the Regulations of
the Office of the Secretary of Transpor-
tation (49 CFR 21.7) and § 152.405.
(8) Plans and specifications for the
proposed development in accordance
with the design and construction
standards listed in appendix B to this
part.