Federal Aviation Administration, DOT Section 171.207 (1) A description of the facility and evidence that the equipment meets the performance requirements of Section 171.207 and is installed in accordance with Section 171.209. (2) A proposed procedure for operating the facility. (3) A proposed maintenance organization and a maintenance manual that meets the requirements of Section 171.211. (4) A statement of intent to meet the requirement of this subpart. (5) A showing that the facility has an acceptable level of operational reliability, and an acceptable standard of performance. Previous equivalent operational experience may be shown to comply with this subparagraph. (b) After the Federal Aviation Administration inspects and evaluates the facility, it advises the owner of the results and of any required changes in the facility or the maintenance manual or maintenance organization. The owner shall then correct the deficiencies, if any, and operate the facility for an in-service evaluation by the Federal Aviation Administration. Section 171.205 Minimum requirements for approval. (a) The following are the minimum requirements that must be met before the Federal Aviation Administration will approve an IFR procedure which incorporates the use of a non-Federal VHF marker beacon facility under this subpart: (1) The facility-s performances, as determined by air and ground inspection, must meet the requirements of Section 171.207. (2) The installation of the equipment must meet the requirements of Section 171.209. (3) The owner must agree to operate and maintain the facility in accordance with Section 171.211. (4) The owner must agree to furnish periodic reports, as set forth in Section 171.213, and agree to allow the Federal Aviation Administration to inspect the facility and its operation whenever necessary. (5) The owner must assure the Federal Aviation Administration that he will not withdraw the facility from service without the permission of the Federal Aviation Administration. (6) The owner must bear all costs of meeting the requirements of this section and of any flight or ground inspections made before the facility is commissioned, except that the Federal Aviation Administration may bear certain of these costs subject to budgetary limitations and policy established by the Administrator. (b) If the applicant for approval meets the requirements of paragraph (a) of this section, the Federal Aviation Administration commissions the facility as a prerequisite to its approval for use in an IFR procedure. The approval is withdrawn at any time the facility does not continue to meet those requirements. Section 171.207 Performance requirements. (a) VHF Marker Beacons must meet the performance requirements set forth in the - International Standards and Recommended Practices, Aeronautical Telecommunications, Part I, paragraphs 3.1.6 and 3.6. - (Annex 10 to the Convention on International Civil Aviation) except those portions that pertain to identification. Identification of a marker beacon (75 MHz) must be in accordance with - U.S. Standard Flight Inspection Manual, - Section 219. (b) The facility must perform in accordance with recognized and accepted good electronic engineering practices for the desired service. The facility must be checked periodically during the in-service test evaluation period for calibration and stability. These tests and ground tests of the marker radiation characteristics must be conducted in accordance with the maintenance manual required by Section 171.211(b). (c) It must be shown during ground inspection of the design features of the equipment that there will not be conditions that will allow unsafe operations because of component failure or deterioration. (d) Flight inspection to determine the adequacy of the facility-s operational performance and compliance with applicable - Standards and Recommended Practices - are conducted in accordance with the - U.S. Standard Flight Inspection Manual. - The original test is made by the Federal Aviation Administration and later tests 827 VerDate Sep<11>2014 08:20 May 17, 2019 Jkt 247048 PO 00000 Frm 00837 Fmt 8010 Sfmt 8010 Y:\SGML\247048.XXX 247048