Federal Aviation Administration, DOT Section 171.255 Section 171.259 Requests for IFR procedures. (a) Each person who requests an IFR procedure based on an ISMLS facility that he owns must submit the following information with that request: (1) A description of the facility and evidence that the equipment meets the performance requirements of SectionSection 171.259, 171.261, 171.263, 171.265, 171.267, and 171.269, and is installed in accordance with Section 171.271. (2) A proposed procedure for operating the facility. (3) A proposed maintenance organization and a maintenance manual that meets the requirements of Section 171.273. (4) A statement of intent to meet the requirements of this subpart. (5) A showing that the ISMLS facility has an acceptable level of operational reliability, maintainability and acceptable standard of performance. Previous equivalent operational experience with a facility with identical design and operational characteristics will be considered in showing compliance with this paragraph. (b) After the FAA inspects and evaluates the ISMLS facility, it advises the owner of the results and of any required changes in the ISMLS facility or in the maintenance manual or maintenance organization. The owner must then correct the deficiencies, if any, and operate the ISMLS facility for an inservice evaluation by the FAA. Section 171.257 Minimum approval. requirements for (a) The following are the minimum requirements that must be met before the FAA approves an IFR procedure for a non-Federal ISMLS facility: (1) The performance of the ISMLS facility, as determined by flight and ground inspection conducted by the FAA, must meet the requirements of SectionSection 171.259, 171.261, 171.263, 171.265, 171.267, and 171.269. (2) The installation of the equipment must meet the requirements of Section 171.271. (3) The owner must agree to operate and maintain the ISMLS facility in accordance with Section 171.273. (4) The owner must agree to furnish periodic reports as set forth in Section 171.275 and agree to allow the FAA to inspect the facility and its operation whenever necessary. (5) The owner must assure the FAA that he will not withdraw the ISMLS facility from service without the permission of the FAA. (6) The owner must bear all costs of meeting the requirements of this section and of any flight or ground inspection made before the ISMLS facility is commissioned, except that the FAA may bear certain costs subject to budgetary limitations and policy established by the Administrator. (b) If the applicant for approval meets the requirements of paragraph (a) of this section, the FAA approves the ISMLS facility for use in an IFR procedure. The approval is withdrawn at any time that the ISMLS facility does not continue to meet those requirements. In addition, the ISMLS facility may be de-commissioned whenever the frequency channel is needed for higher priority common system service. Section 171.259 Performance requirements: General. (a) The ISMLS consists of the following basic components: (1) C-Band (5000 MHz-5030 MHz) localizer equipment, associated monitor system, and remote indicator equipment; (2) C-Band (5220 MHz-5250 MHz) glide path equipment, associated monitor system, and remote indicator equipment; (3) VHF marker beacons (75 MHz), associated monitor systems, and remote indicator equipment. (4) An ISMLS airborne receiver or a VHF/UHF ILS receiver modified to be capable of receiving the ISMLS signals. This modification requires the addition of a C-Band antenna, a converter unit, a microwave/ILS mode control, and a VHF/UHF receiver modification kit. (b) The electronic ground equipments in paragraph (a)(1), (2), and (3) of this section, must be designed to operate on a nominal 120/240 volt, 60 Hz, 3-wire single phase AC power source. (c) ISMLS ground equipment must meet the following service conditions: (1) AC line parameters, DC voltage, elevation, and duty: 120 V nominal value, 102 V to 138 V (Section1 V).* 831 VerDate Sep<11>2014 08:20 May 17, 2019 Jkt 247048 PO 00000 Frm 00841 Fmt 8010 Sfmt 8010 Y:\SGML\247048.XXX 247048