Pipeline and Haz. Matls. Safety Admin., DOT Transportation or the Department of Homeland Security. [68 FR 14521, Mar. 25, 2003, as amended at 75 FR 10989, Mar. 9, 2010] Section 172.804 Relationship to other Federal requirements. To avoid unnecessary duplication of security requirements, security plans that conform to regulations, standards, protocols, or guidelines issued by other Federal agencies, international organizations, or industry organizations may be used to satisfy the requirements in this subpart, provided such security plans address the requirements specified in this subpart. Section 172.820 Additional planning requirements for transportation by rail. (a) General. Each rail carrier transporting in commerce one or more of the following materials is subject to the additional safety and security planning requirements of this section: (1) More than 2,268 kg (5,000 lbs) in a single carload of a Division 1.1, 1.2 or 1.3 explosive; (2) A quantity of a material poisonous by inhalation in a single bulk packaging; (3) A highway route-controlled quantity of a Class 7 (radioactive) material, as defined in Section 173.403 of this subchapter; or (4) A high-hazard flammable train (HHFT) as defined in Section 171.8 of this subchapter. (b) Not later than 90 days after the end of each calendar year, a rail carrier must compile commodity data for the previous calendar year for the materials listed in paragraph (a) of this section. The following stipulations apply to data collected: (1) Commodity data must be collected by route, a line segment or series of line segments as aggregated by the rail carrier. Within the rail carrier selected route, the commodity data must identify the geographic location of the route and the total number of shipments by UN identification number for the materials specified in paragraph (a) of this section. (i) A rail carrier subject to additional planning requirements of this section based on paragraph (a)(4) of this section, must complete the initial process Section 172.820 by March 31, 2016, using data for the six month period from July 1, 2015 to December 31, 2015; or (ii) A rail carrier subject to additional planning requirements of this section based on paragraph (a)(4) of this section, must complete the initial process by March 31, 2016, using data for all of 2015, provided the rail carrier indicates in their initial analysis that it has chosen this option. (2) A carrier may compile commodity data, by UN number, for all Class 7 materials transported (instead of only highway route controlled quantities of Class 7 materials) and for all Division 6.1 materials transported (instead of only Division 6.1 poison inhalation hazard materials). (c) Rail transportation route analysis. For each calendar year, a rail carrier must analyze the safety and security risks for the transportation route(s), identified in the commodity data collected as required by paragraph (b) of this section. The route analysis must be in writing and include the factors contained in appendix D to this part, as applicable. (1) The safety and security risks present must be analyzed for the route and railroad facilities along the route. For purposes of this section, railroad facilities are railroad property including, but not limited to, classification and switching yards, storage facilities, and non-private sidings. This term does not include an offeror-s facility, private track, private siding, or consignee-s facility. (2) In performing the analysis required by this paragraph, the rail carrier must seek relevant information from state, local, and tribal officials, as appropriate, regarding security risks to high-consequence targets along or in proximity to the route(s) utilized. If a rail carrier is unable to acquire relevant information from state, local, or tribal officials, then it must document that in its analysis. For purposes of this section, a high-consequence target means a property, natural resource, location, area, or other target designated by the Secretary of Homeland Security that is a viable terrorist target of national significance, the attack of which by railroad could result in catastrophic 449 VerDate Sep<11>2014 16:41 Oct 31, 2018 Jkt 244226 PO 00000 Frm 00459 Fmt 8010 Sfmt 8010 Q:\49\49V2.TXT PC31