Previous Page | Page 285 | Next Page |
276
14 CFR Ch. I (1–1–14 Edition)
§ 23.959
conditions in § 23.959, except that full
tanks must be used.
(b) If fuel can be pumped from one
tank to another in flight, the fuel tank
vents and the fuel transfer system
must be designed so that no structural
damage to any airplane component can
occur because of overfilling of any
tank.
[Doc. No. 4080, 29 FR 17955, Dec. 18, 1964, as
amended by Amdt. 23–43, 58 FR 18972, Apr. 9,
1993]
§ 23.959
Unusable fuel supply.
(a) The unusable fuel supply for each
tank must be established as not less
than that quantity at which the first
evidence of malfunctioning occurs
under the most adverse fuel feed condi-
tion occurring under each intended op-
eration and flight maneuver involving
that tank. Fuel system component fail-
ures need not be considered.
(b) The effect on the usable fuel
quantity as a result of a failure of any
pump shall be determined.
[Amdt. 23–7, 34 FR 13093, Aug. 13, 1969, as
amended by Amdt. 23–18, 42 FR 15041, Mar. 17,
1977; Amdt. 23–51, 61 FR 5136, Feb. 9, 1996]
§ 23.961
Fuel system hot weather oper-
ation.
Each fuel system must be free from
vapor lock when using fuel at its crit-
ical temperature, with respect to vapor
formation, when operating the airplane
in all critical operating and environ-
mental conditions for which approval
is requested. For turbine fuel, the ini-
tial temperature must be 110
°
F, ¥0
°
,
+5
°
F or the maximum outside air tem-
perature for which approval is re-
quested, whichever is more critical.
[Doc. No. 26344, 58 FR 18972, Apr. 9, 1993; 58
FR 27060, May 6, 1993]
§ 23.963
Fuel tanks: General.
(a) Each fuel tank must be able to
withstand, without failure, the vibra-
tion, inertia, fluid, and structural loads
that it may be subjected to in oper-
ation.
(b) Each flexible fuel tank liner must
be shown to be suitable for the par-
ticular application.
(c) Each integral fuel tank must have
adequate facilities for interior inspec-
tion and repair.
(d) The total usable capacity of the
fuel tanks must be enough for at least
one-half hour of operation at maximum
continuous power.
(e) Each fuel quantity indicator must
be adjusted, as specified in § 23.1337(b),
to account for the unusable fuel supply
determined under § 23.959(a).
[Doc. No. 4080, 29 FR 17955, Dec. 18, 1964; 30
FR 258, Jan. 9, 1965, as amended by Amdt 23–
34, 52 FR 1832, Jan. 15, 1987; Amdt. 23–43, 58
FR 18972, Apr. 9, 1993; Amdt. 23–51, 61 FR 5136,
Feb. 9, 1996]
§ 23.965
Fuel tank tests.
(a) Each fuel tank must be able to
withstand the following pressures with-
out failure or leakage:
(1) For each conventional metal tank
and nonmetallic tank with walls not
supported by the airplane structure, a
pressure of 3.5 p.s.i., or that pressure
developed during maximum ultimate
acceleration with a full tank, which-
ever is greater.
(2) For each integral tank, the pres-
sure developed during the maximum
limit acceleration of the airplane with
a full tank, with simultaneous applica-
tion of the critical limit structural
loads.
(3) For each nonmetallic tank with
walls supported by the airplane struc-
ture and constructed in an acceptable
manner using acceptable basic tank
material, and with actual or simulated
support conditions, a pressure of 2 p.s.i.
for the first tank of a specific design.
The supporting structure must be de-
signed for the critical loads occurring
in the flight or landing strength condi-
tions combined with the fuel pressure
loads resulting from the corresponding
accelerations.
(b) Each fuel tank with large, unsup-
ported, or unstiffened flat sur-
faces,whose failure or deformation
could cause fuel leakage, must be able
to withstand the following test without
leakage, failure, or excessive deforma-
tion of the tank walls:
(1) Each complete tank assembly and
its support must be vibration tested
while mounted to simulate the actual
installation.
(2) Except as specified in paragraph
(b)(4) of this section, the tank assembly
must be vibrated for 25 hours at a total
displacement of not less than
1
⁄
32
of an
VerDate Mar<15>2010
10:12 Mar 18, 2014
Jkt 232046
PO 00000
Frm 00286
Fmt 8010
Sfmt 8010
Y:\SGML\232046.XXX
232046
pmangrum on DSK3VPTVN1PROD with CFR
Previous Page | Page 285 | Next Page |