Previous Page | Page 614 | Next Page |
605
Federal Aviation Administration, DOT
Pt. 25, App. I
I25.3
Performance and System Reliability Re-
quirements.
The applicant must comply with the per-
formance and ATTCS reliability require-
ments as follows:
(a) An ATTCS failure or a combination of
failures in the ATTCS during the critical
time interval:
(1) Shall not prevent the insertion of the
maximum approved takeoff thrust or power, or
must be shown to be an improbable event.
(2) Shall not result in a significant loss or
reduction in thrust or power, or must be
shown to be an extremely improbable event.
(b) The concurrent existence of an ATTCS
failure and an engine failure during the crit-
ical time interval must be shown to be ex-
tremely improbable.
(c) All applicable performance require-
ments of Part 25 must be met with an engine
failure occurring at the most critical point
during takeoff with the ATTCS system func-
tioning.
I25.4
Thrust Setting.
The initial takeoff thrust or power setting
on each engine at the beginning of the take-
off roll may not be less than any of the fol-
lowing:
(a) Ninety (90) percent of the thrust or
power set by the ATTCS (the maximum
takeoff thrust or power approved for the air-
plane under existing ambient conditions);
(b) That required to permit normal oper-
ation of all safety-related systems and equip-
ment dependent upon engine thrust or power
lever position; or
(c) That shown to be free of hazardous en-
gine response characteristics when thrust or
power is advanced from the initial takeoff
thrust or power to the maximum approved
takeoff thrust or power.
I25.5
Powerplant Controls.
VerDate Mar<15>2010
10:12 Mar 18, 2014
Jkt 232046
PO 00000
Frm 00615
Fmt 8010
Sfmt 8002
Y:\SGML\232046.XXX
232046
EC28SE91.082</GPH>
pmangrum on DSK3VPTVN1PROD with CFR
Previous Page | Page 614 | Next Page |