Previous Page Page 366 Next Page  
background image

356 

14 CFR Ch. I (1–1–14 Edition) 

Pt. 60, App. D 

T

ABLE

D3E—T

ABLE OF

F

UNCTIONS AND

S

UBJECTIVE

T

ESTS

L

EVEL

5 FTD—Continued 

QPS requirements 

Entry No. 

Operations tasks 

4. Instrument Procedures 

4.a. ........................

Coupled instrument approach maneuvers (as applicable for the systems installed). 

5. Normal and Abnormal Procedures (any phase of flight) 

5.a. ........................

Normal system operation (installed systems). 

5.b. ........................

Abnormal/Emergency system operation (installed systems). 

6. Postflight Procedures 

6.a. ........................

Parking and Securing. 

6.b. ........................

Engine and systems operation. 

6.c. ........................

Parking brake operation. 

6.d. ........................

Rotor brake operation. 

6.e. ........................

Abnormal/emergency procedures. 

7. Instructor Operating Station (IOS), as appropriate 

7.a. ........................

Power Switch(es). 

7.b. ........................

Preset positions (ground; air) 

7.c. ........................

Helicopter system malfunctions. 

7.c.1. .....................

Insertion/deletion. 

7.c.2. .....................

Problem clear. 

7.d. ........................

Control Loading System (as applicable) On/off/emergency stop. 

7.e. ........................

Observer Stations. 

7.e.1. .....................

Position. 

7.e.2. .....................

Adjustments. 

T

ABLE

D3F—T

ABLE OF

F

UNCTIONS AND

S

UBJECTIVE

T

ESTS

L

EVEL

4 FTD 

QPS requirements 

Entry No. 

Operations tasks 

Tasks in this table are subject to evaluation if appropriate for the helicopter simulated as indicated in the SOQ Configuration 

List or for a Level 4 FTD. Items not installed or not functional on the FTD and not appearing on the SOQ Configuration List, 
are not required to be listed as exceptions on the SOQ. 

1. Preflight Procedures 

1.a. ........................

Preflight Inspection (Flight Deck Only) switches, indicators, systems, and equipment. 

1.b. ........................

APU/Engine start and run-up. 

1.b.1. .....................

Normal start procedures. 

1.b.2. .....................

Alternate start procedures. 

1.b.3. .....................

Abnormal starts and shutdowns. 

2. Normal and Abnormal Procedures (any phase of flight) 

2.a. ........................

Normal system operation (installed systems). 

2.b. ........................

Abnormal/Emergency system operation (installed systems). 

VerDate Mar<15>2010 

20:48 Jan 30, 2014

Jkt 232047

PO 00000

Frm 00366

Fmt 8010

Sfmt 8002

Q:\14\14V2.TXT

ofr150

PsN: PC150

  Previous Page Page 366 Next Page