Conditioning. Condition the specimens
at 70
° ±
5
°
F (21
° ±
2
°
C) and 55%
±
10% relative
humidity for a minimum of 24 hours prior to
testing.
(d)
Preparation of apparatus. (1) Level and
center the frame assembly to ensure align-
ment of the calorimeter and/or thermocouple
rake with the burner cone.
(2) Turn on the ventilation hood for the
test chamber. Do not turn on the burner
blower. Measure the airflow of the test
chamber using a vane anemometer or equiv-
alent measuring device. The vertical air ve-
locity just behind the top of the upper insu-
lation blanket test specimen must be 100
±
50
ft/min (0.51
±
0.25 m/s). The horizontal air ve-
locity at this point must be less than 50 ft/
min (0.25 m/s).
(3) If a calibrated flow meter is not avail-
able, measure the fuel flow rate using a grad-
uated cylinder of appropriate size. Turn on
the burner motor/fuel pump, after insuring
that the igniter system is turned off. Collect
the fuel via a plastic or rubber tube into the
VerDate Mar<15>2010
10:12 Mar 18, 2014
Jkt 232046
PO 00000
Frm 00606
Fmt 8010
Sfmt 8002
Y:\SGML\232046.XXX
232046
ER31JY03.018</GPH>
pmangrum on DSK3VPTVN1PROD with CFR
Previous Page | Page 605 | Next Page |