Previous Page | Page 190 | Next Page |
180
14 CFR Ch. I (1–1–14 Edition)
Pt. 60, App. B
T
ABLE
B3A—T
ABLE OF
F
UNCTIONS AND
S
UBJECTIVE
T
ESTS
L
EVEL
6 FTD—Continued
QPS requirements
Entry No.
Operations tasks
8.a. ............
Power Switch(es).
8.b. ............
Airplane conditions.
8.b.1. .........
Gross weight, center of gravity, and fuel loading and allocation.
8.b.2. .........
Airplane systems status.
8.b.3. .........
Ground crew functions (e.g., external power, push back).
8.c. ............
Airports.
8.c.1. .........
Selection.
8.c.2. .........
Runway selection.
8.c.3. .........
Preset positions (e.g., ramp, over FAF).
8.d. ............
Environmental controls.
8.d.1. .........
Temperature.
8.d.2. .........
Climate conditions (e.g., ice, rain).
8.d.3. .........
Wind speed and direction.
8.e. ............
Airplane system malfunctions.
8.e.1. .........
Insertion/deletion.
8.e.2. .........
Problem clear.
8.f. .............
Locks, Freezes, and Repositioning.
8.f.1. ..........
Problem (all) freeze/release.
8.f.2. ..........
Position (geographic) freeze/release.
8.f.3. ..........
Repositioning (locations, freezes, and releases).
8.f.4. ..........
Ground speed control.
8.f.5. ..........
Remote IOS, if installed.
9. Sound Controls. On/off/adjustment
10. Control Loading System (as applicable) On/off/emergency stop.
11. Observer Stations.
11.a. ..........
Position.
11.b. ..........
Adjustments.
End QPS Requirements
T
ABLE
B3B—T
ABLE OF
F
UNCTIONS AND
S
UBJECTIVE
T
ESTS
L
EVEL
5 FTD
QPS requirements
Entry No.
Operations tasks
Tasks in this table are subject to evaluation if appropriate for the airplane system or systems simulated as indi-
cated in the SOQ Configuration List as defined in Appendix B, Attachment 2 of this part.
1. Preflight
Accomplish a functions check of all installed switches, indicators, systems, and equipment at all crewmembers’
and instructors’ stations, and determine that the flight deck (or flight deck area) design and functions replicate
the appropriate airplane.
2. Surface Operations (pre-takeoff)
VerDate Mar<15>2010
20:48 Jan 30, 2014
Jkt 232047
PO 00000
Frm 00190
Fmt 8010
Sfmt 8002
Q:\14\14V2.TXT
ofr150
PsN: PC150
Previous Page | Page 190 | Next Page |