6 FTD—Continued 

QPS requirements 

Entry No. 

Operations tasks 

8.a. ............

Power Switch(es). 

8.b. ............

Airplane conditions. 

8.b.1. .........

Gross weight, center of gravity, and fuel loading and allocation. 

8.b.2. .........

Airplane systems status. 

8.b.3. .........

Ground crew functions (e.g., external power, push back). 

8.c. ............

Airports. 

8.c.1. .........

Selection. 

8.c.2. .........

Runway selection. 

8.c.3. .........

Preset positions (e.g., ramp, over FAF). 

8.d. ............

Environmental controls. 

8.d.1. .........

Temperature. 

8.d.2. .........

Climate conditions (e.g., ice, rain). 

8.d.3. .........

Wind speed and direction. 

8.e. ............

Airplane system malfunctions. 

8.e.1. .........

Insertion/deletion. 

8.e.2. .........

Problem clear. 

8.f. .............

Locks, Freezes, and Repositioning. 

8.f.1. ..........

Problem (all) freeze/release. 

8.f.2. ..........

Position (geographic) freeze/release. 

8.f.3. ..........

Repositioning (locations, freezes, and releases). 

8.f.4. ..........

Ground speed control. 

8.f.5. ..........

Remote IOS, if installed. 

9. Sound Controls. On/off/adjustment 

10. Control Loading System (as applicable) On/off/emergency stop. 

11. Observer Stations. 

11.a. ..........

Position. 

11.b. ..........

Adjustments. 

End QPS Requirements 

T

ABLE

B3B—T

ABLE OF

F

UNCTIONS AND

S

UBJECTIVE

T

ESTS

L

EVEL

5 FTD 

QPS requirements 

Entry No. 

Operations tasks 

Tasks in this table are subject to evaluation if appropriate for the airplane system or systems simulated as indi-

cated in the SOQ Configuration List as defined in Appendix B, Attachment 2 of this part. 

1. Preflight 

Accomplish a functions check of all installed switches, indicators, systems, and equipment at all crewmembers’ 

and instructors’ stations, and determine that the flight deck (or flight deck area) design and functions replicate 
the appropriate airplane. 

2. Surface Operations (pre-takeoff) 

VerDate Mar<15>2010 

20:48 Jan 30, 2014

Jkt 232047

PO 00000

Frm 00190

Fmt 8010

Sfmt 8002

Q:\14\14V2.TXT

ofr150

PsN: PC150

  Previous Page Page 190 Next Page